CLIMBING SYSTEMS

ADJUSTABLE CLIMBING BRACKETS

Support for the formwork Faresin Formwork when climbing procedure for vertical walls. The position of the brackets set in the previous concreted wall and installed a new anchor in the new pouring step. After the concrete is poured and the wall formwork is stripped, the climbing unit – brackets are firmly connected with the formwork –will reacted vertical with the appropriate lifting e.g crane to the next casting. The formwork can be moved horizontally on the bracket by a carriage, which is firmly connected with the bracket – for striking and setting! Depending on the situation, the anchors will be run in two different sizes DIW Ø15 or Ø20. The corresponding necessary finishing platforms are designed with quick connect couplings and pipes. The forms can be mounted either fix or mobile on the bracket as well as inclined to be used at dams. Unlike the brackets for tied wallforms, those brackets that are used for dams are mostly for “single-sided formwork” designed and usable! With these brackets can then formed also sloping walls (interior and exterior) up to 30°. Climbing-moving units can run up to 6 meters in width. Service and accessories such as stairs and hatches in complete deliveries allow you to perform all phases of climbing in complete safety for the workers.